Transforming Infrastructure Performance 2021 is positive, accessible and hopefully provides the drive needed to invest in change by looking for opportunities to align with the rest of the industry, and by taking small steps which can be expanded upon for further growth.. On a related note, although the definition of what we mean by a platform approach to construction is now becoming more fulsome, we can still go back to the IPA document from 2018 and continue to find it completely relevant and valid.
The Programme was also a way to build on the Ministry of Justice’s (MoJ) recognised role as innovative leaders in public sector design and construction.The MoJ was, for example, the pathfinder department for Government adoption of Building Information Modelling (BIM) and lean construction.. Standardised solutions.
A key aspect of PETP was to develop standardised solutions at a range of scales that could be deployed across multiple buildings and sites, from components and rooms to entire building types and continues through the new capacity programme(s).There were many reasons for this approach:.Standard solutions allow for a greater level of design and refinement – if a solution is going to be used multiple times then the benefit of good design is multiplied and amplified.
It afforded us a far greater level of stakeholder engagement and buy-in than we would typically achieve for a one-off design (see below).This resulted in, for example, designs that were highly optimised in terms of layouts, space allocation, adjacencies and functional flows – which could then be deployed across the PETP programme and wider prison estate.
It creates further efficiencies.
For example, the standard building types can be used across a range of sites.While designers may aim for uniformity across process areas, this can lead to inefficient and underutilised space.. Right-Sizing Battery Factory Designs.
A more cost-effective approach is to 'shrink-wrap' the assembly process.By mapping and right-sizing the spatial, environmental, and material transfer needs of each step, the building can be designed to precisely match its functional requirements.
This reduces capital costs, operational costs, and energy use..Considerations for Right-Sizing:.